案例
SeaShield FX-70™系统历史案例研究 —— 海上石油平台
埋地涂层
SeaShield FX-70™系统历史案例研究 —— 海上石油平台
PROJECT DATA
| Location | Gulf of Mexico |
| Products | SeaShield FX-70™ System |
| Project | Steel pile protection for Offshore Oil Platform |
| Date | July 1977 |
PROJECT DETAILS
The SeaShield FX-70™ System was the first in-place repair solution for damaged concrete, steel, and timber piles when it was launched in 1970, and many of those first repairs remain in service today.
This Gulf of Mexico oil platform, located approximately one hundred miles East of Freeport, Texas, required in-place splash zone corrosion protection. The SeaShield FX-70™ System was specified after other systems had been attempted and abandoned because of heavy seas, and other problems associated with offshore operations.
The first phase installation was completed in 14 days and involved protecting fourteen diagonals and kneebraces with two-size foot jackets each.

FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-2

FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-3

FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-4

FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-5
FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-2
FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-3
FX-70-Case-Study-Gulf-of-Mexico-Offshore-Oil-Platform-1977-image-4